B R I D G E B U I L D E R
 NRS AS: Friday, November 21, 2008 On small pierheads 

CROSS-MEMBER FOR INSTALLATION ON SMALL PIERHEADS:


 Position:  Phase: Description:
 Upper left  1  Assembly at pierhead as small as 3 m
 Lower left  2  Concreting of 1st segment on each side of the pier finished
 Upper right  3  Splitting of travellers (bridgebuilder)
 Lower right  4  12,2 m concreted (standard bridgebuilder); ready for normal procedure


When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.